Verdae Boulevard Streetscape

New streetscaping on Verdae Boulevard will include a multi-use sidewalk, medians, intersection work and repaving from Woodruff Road to Laurens Road.

  1. 1
  2. 2
  3. 3
  4. 4

Improvements planned for Verdae Boulevard, which connects Laurens Road (US 276) and Woodruff Road (SC 146), include a new 10-foot sidewalk/multi-use path, raised medians with landscaping and street lighting.

The project scope also includes traffic control, street resurfacing, grading, curb and gutter, drainage and traffic signal upgrades.

Update: JUNE 2019

  • Paving from Woodruff to Salters Roads complete
  • All lanes on roundabout at Parallel Parkway will be fully open
  • Work on the Bonaventure Circle roundabout underway